Nissan Electric Vehicle Battery Plant

Scroll

Nissan Electric Vehicle Battery Plant

Location Icon Smyrna, Tennessee

Size Icon 450,000 SF

Timeline Icon TWF 14 Months

Timeline Icon TWF
Architect: Albert Khan Associates, Inc.
Timeline Icon TWF
This 450,000 SF Shell Building hosts Nissan’s Electric Vehicle Battery Manufacturing Plant. This project allowed DSB to utilize our self performance capabilities in the Pre-Engineered Metal Building Erection. All building erection was performed with our own crews, and enabled us to complete this project ahead of the aggressive schedule.